Skip to main content

Clean Article

Breaking News

Instructions issued to complete the construction of the new college building in Kota by March 2027; MLA reprimands officials over the slow pace of work on the Nalanda Library.

  • Boosting educational infrastructure in Raipur West: Progress on the ₹4.65 crore college building is satisfactory; strict directives issued to accelerate work on the ₹22 crore Nalanda Library.
  • Negligence regarding students’ futures will not be tolerated: MLA conducts surprise inspections of the Kota College and Nalanda Library construction sites.

With the aim of ensuring the timely completion of ambitious education-related projects in the Raipur West assembly constituency, the MLA conducted surprise inspections of two major educational complexes currently under construction in the area this morning.

Progress on the new college building in Kota (costing ₹4.65 crore) is satisfactory.
The MLA first inspected the new government college building being constructed near ‘Ram Darbar’ in Kota, at a cost of ₹4.65 crore. Expressing satisfaction with the current progress and quality of the construction, he directed officials to complete the entire project and hand over the building by March 2027.

The ground floor of the building will feature an attractive porch, an entrance lobby, a staff room, a computer lab, physics and chemistry labs, a library, a darkroom, an examination control room, a storeroom, offices for the principal and vice-principal, a registrar’s office, and a general administration room. A special ramp is also being constructed to ensure easy accessibility for students with disabilities.

On the first floor, the civil work for modern classrooms, a geology laboratory, a zoology laboratory, and management offices is nearly complete, with finishing work currently underway.

Once completed, this new college building will provide thousands of students from Kota, Gudhiyari, Bharat Mata Chowk, and surrounding neighborhoods with convenient access to higher education in the streams of Science, Arts, and Commerce, right within their own locality. Displeasure over two-month delay in the construction of the ₹22 crore ‘Nalanda Library’

During the next phase of his inspection, the MLA reviewed the construction work of the ‘Nalanda Library,’ a project being developed at a cost of ₹22 crore. Expressing strong displeasure, he reprimanded the concerned officials and the construction agency for the slow pace of work, which is currently running two months behind the established schedule. He issued strict instructions to immediately accelerate the progress by deploying additional resources and labor.

This state-of-the-art library will serve as a major educational hub for thousands of the city’s youth and students preparing for competitive examinations (such as UPSC, CGPSC, Vyapam, banking, NEET, and JEE). Students will have access to a quiet environment, a digital library equipped with Wi-Fi, e-books, and modern facilities for safe, late-night study.

“Providing a superior environment for modern education and competitive exam preparation for the youth of Raipur West is our priority. While the new college being built in Kota will open new doors to higher education, the Nalanda Library will become a catalyst for realizing the dreams of thousands of students. There will be no compromise on the quality of development projects, and officials or agencies that fall behind the stipulated timelines will be held accountable.”