Skip to main content

Clean Article

Breaking News

Initiative to repurpose closed coal mines in Jharkhand; Giridih and Karma OCPs selected for pilot projects

Taking a significant step towards the scientific rehabilitation and sustainable repurposing of coal mines slated for closure in Jharkhand, the state government has selected the Giridih Open Cast Project (OCP) and the Karma OCP in Ramgarh district as pilot projects. A consensus to send a recommendation to the Government of India regarding these two mines was reached during a high-level meeting held in Ranchi.
This initiative is being undertaken under the ‘Technical Cooperation on To-be-Closed Coal Mines (TCCM)’ project, implemented with the collaboration of the Union Ministry of Coal and the German organization GIZ. Senior state government officials—including Arva Rajkamal, Secretary of the Department of Mines and Geology—along with representatives from GIZ, the Coal Controller Organization, Central Coalfields Limited (CCL), and CMPDI, attended the meeting.
A detailed ‘Final Mine Closure and Repurposing Plan’ will be prepared for the selected mines. This plan will include a comprehensive study of the potential for repurposing land, water resources, the environment, infrastructure, and the local economy following the closure of the mines.


The objective of this initiative is to transform mine closures from a mere cessation of mining operations into a process of creating assets that are environmentally safe, socially inclusive, and economically productive. This model, developed based on international experience and modern technologies, can be replicated in other coal-bearing regions of the country in the future.
The project is expected to generate new employment and livelihood opportunities for local residents, alongside environmental improvements in mining-affected areas. The land from closed mines could be utilized for renewable energy, tourism, agriculture, horticulture, fisheries, skill development centers, and other economic activities. Eight villages falling within a five-kilometer radius of the Karma OCP—Sugia, Marar, Bongabar, Karma, Kaitha, Kander, Lodhma, and Panki—have been identified. Assessments regarding socio-economic conditions, vulnerable sections, and livelihood opportunities are currently underway in these areas. A ‘Mine Closure Advisory Committee’ has also been constituted to facilitate local coordination.
A detailed Detailed Project Report (DPR) will be prepared under the project, covering aspects such as environmental restoration, land use, water and mine-void management, and the repurposing of infrastructure. Additionally, opportunities for renewable energy projects and other investments at suitable locations will be explored.
Describing this initiative as a significant step for Jharkhand, the state government emphasized the necessity of keeping mining areas productive even after mineral resources are exhausted. This model could serve as the foundation for sustainable post-mining development in the state.
The TCCM project will operate until March 2030, with plans to replicate the insights gained here at other closing coal mines across the country.